Platform overview
Engineered for every deliverable.
One workspace reads the whole project, computes every number from the governing standard, and assembles the deliverables you sign. Built for the teams who carry the risk.
Request a demoDocuments
- Mechanical specification.pdf
- Services drawings L1-L4.pdf
- Equipment schedule.xlsx
- Head contract extract.pdf
Archie
Deliverables
Test schedule
Signed
ITR pack, 12 systems
For review
Evidence and calculation pack
Draft
Why teams choose Archie.
Assistant
6 of 38 systems exceed the mandatory threshold and must be tested. The governing basis is AS 4254.2 for high-pressure ductwork; the rest fall under DW/144.
Move fast, stay sure
Ask the whole project in plain language and get the answer with its clause attached. No reading three thousand pages to settle one question.
Review table: test requirements
| Document | Requirement | Source |
|---|---|---|
| Spec, Sec 23 05 | 500 Pa | p.42 |
| Head contract | AS 4254.2 | p.11 |
| Addendum 3 | Class C seal | p.4 |
Cells are extracted verbatim, never computed, and stay unverified until a human confirms them.
One trail, every seat
Subcontractor, builder, commissioner, client: every seat works from the same governed set, and every value traces back to it.
Review queue
Independent commissionerTest schedule Rev B
Signedsha256 9f2c...e81a
ITR pack, 12 systems
Ready for reviewSigned records are hashed and locked. Revisions become new versions.
Nothing you cannot defend
Every number is computed from the standard and shown with its working, so review becomes verification rather than trust.
One workspace, engineered for the whole commissioning trail. Read the project, compute the numbers, assemble the pack, and sign it off, every step on the record.
Six surfaces that share one source of truth.
Upload the documents once. Everything else, the answers, the numbers, the deliverables, is built from that same governed set and traces back to it.
The Assistant
Ask the whole project a question.
Archie reads every specification, drawing, schedule, contract and model in the job, then answers in plain language. Every answer quotes the page and clause behind it, and any answer can turn into an action: build a schedule, open a review table, run a workflow.
- Answers cite the document, page and clause every time
- Ask a question or start an action from the same box
- Extraction failures are surfaced, never swallowed
Assistant
6 of 38 systems exceed the mandatory threshold and must be tested. The governing basis is AS 4254.2 for high-pressure ductwork; the rest fall under DW/144.
Discipline workspaces
A scoped room for every discipline.
Each discipline gets its own workspace: ductwork leakage, tender scope, and more as they come online. The chat, the tools and the documents are scoped to that discipline, so the context stays clean and the right actions are always at hand.
- Conversations and tools scoped to one discipline
- New disciplines slot in as separate workspaces
- The same engine and provenance behind every one
Workspaces
- 14 deliverables
Ductwork leakage
AS 4254.2 / DW-144
- 6 deliverables
Tender scope
Scope-gap reconciliation
- soon
Fire dampers
Coming soon
Each workspace scopes the chat, the tools and the documents to one discipline.
The Vault
Every document, in one governed place.
The Vault holds the whole project: specs, drawings, equipment schedules, contracts and Revit or IFC models. Archie extracts systems, quantities and requirements as documents land, so the project is understood the moment it is uploaded.
- Handles specs, drawings, schedules, contracts and models
- Extraction status shown per document as it lands
- One source of truth every deliverable is built from
The Vault
4 documents- Mechanical specification.pdfSpecExtracted
- Services drawings L1-L4.pdfDrawingsExtracted
- Equipment schedule.xlsxScheduleExtracted
- Architectural model.ifcModelParsing
Systems, quantities and requirements are extracted as documents land.
Review tables
One answer, across every document.
Pick the documents, describe the columns, and Archie extracts the answer from each one, with the page and a verbatim excerpt behind every cell. Nothing is computed and nothing is assumed: cells stay unverified until a person confirms them, then export to CSV.
- Every cell is a verbatim extraction with a page citation
- Cells marked unverified until a human checks them
- Export the reviewed table straight to CSV
Review table: test requirements
| Document | Requirement | Source |
|---|---|---|
| Spec, Sec 23 05 | 500 Pa | p.42 |
| Head contract | AS 4254.2 | p.11 |
| Addendum 3 | Class C seal | p.4 |
Cells are extracted verbatim, never computed, and stay unverified until a human confirms them.
Workflows
Run the weekly ritual, automatically.
Construction has a rhythm: the same packs, the same checks, the same status update, every week. A workflow captures that rhythm as a trigger and a set of steps, so it runs on a schedule or when a new drawing lands, and reports what it did.
- Triggers on a schedule or when a document is uploaded
- Linear steps: run an action, draft, notify
- Every run recorded, step by step
Workflow: weekly commissioning pack
- 01Build the leakage scheduleAction
- 02Assemble the ITR packAction
- 03Draft the weekly status emailDraft
- 04Notify the commissioning leadNotify
Last run completed 4 steps, no errors.
The AI never invents a number.
Compliance values are computed by a deterministic engine, worked from a verified standards library, never written by the language model. The AI reads and drafts; the engine does the maths. That line is what lets you sign.
Computed, not guessed
Every value is worked from the governing standard.
Traced to the source
Any value, back to its document, page and clause.
Versioned criteria
The basis is pinned, so any run can be reproduced.
From document dump to signed pack.
Every surface above feeds the same pipeline: measured, computed, assembled, reviewed and handed over, with the working shown at each step.
Quantity take-off
Measured from the drawings, not estimated.
Archie measures the job from your drawing set and shows how every number was reached. Anything uncertain is disclosed, never quietly spread across systems.
- Measured across the full drawing set
- Every quantity accounted for
- Estimates flagged for confirmation, not buried
Quantity take-off
2,140 m
Total run length
5,830 m²
Surface area
214 m
Min test sample
Measured from the drawing set, cross-checked against the model.
Compliance
Computed to the governing standard.
Allowables, test pressures and thresholds come from a verified standards library. When requirements conflict, the most onerous governs, and the schedule shows why.
- Worked from the standard, every run on the record
- The governing basis shown on every value
- Criteria versioned, so any schedule can be reproduced
Leakage test schedule
Criteria v1.2| System | Level | Flow L/s | Allowable L/s | Governing |
|---|---|---|---|---|
| EAF-01 | L1 | 4,200 | 210.0 | AS 4254.2 |
| SPF-02 | L2 | 3,650 | 182.5 | AS 4254.2 |
| OAF-03 | L2 | 2,400 | 96.4 | DW/144 |
| GEF-04 | L3 | 1,850 | 78.1 | DW/144 |
38 systems. Every allowable is worked from the standard and cites its clause.
Schedules and ITRs
Site paperwork, pre-filled and consistent.
One master test schedule and an inspection test record for every system, each pre-filled with particulars, pre-test checks and sign-off blocks. Documents follow a controlled numbering standard with revision history.
- One ITR per system, generated together, always consistent
- Document-controlled PDFs with revision history
- Blank result fields ready for site capture
ITR: duct leakage test
NS-JOB-MA014-EAF-01 Rev ATest pressure
500 Pa
Design flow
4,200 L/s
Governing allowable
210.0 L/s
Basis
AS 4254.2, Cl 2.2.4
- Ductwork installed per drawings
- Joints sealed to specified sealing class
- Blanking plates fitted, instruments calibrated
Evidence
The working, shown in full.
Every pack ships with the criteria, constants, grouping logic, take-off audit and per-system worked examples. Any reviewer can retrace any number without asking who calculated it.
- Worked examples with the full arithmetic chain
- Provenance table: document, locator, method, confidence
- Limitations stated, estimates marked for confirmation
Evidence and calculation pack
Criteria and constants
Every constant versioned and verified against its source clause.
Quantity take-off audit
Every metre accounted for. Anything uncertain disclosed, not distributed.
Worked example: EAF-01
The full calculation, step by step, with the governing basis shown.
Scope alerts
Finds what is missing before it costs you.
Systems that appear on drawings but not in schedules, thresholds that trigger mandatory testing, extraction gaps. Archie raises them as alerts with severity, instead of letting them surface at handover.
- Cross-references drawings, schedules and specs
- Severity-graded: info, warning, blocker
- Alerts attach to the systems they affect
Scope alerts
SCOPE_GAP
Two systems on L3 appear on drawings but not in the equipment schedule.
THRESHOLD
6 systems exceed the mandatory test threshold and must be tested.
TAKEOFF_COMPLETE
Drawing take-off finished. 96% of metreage attributed directly.
Sign-off
Independent sign-off, sealed records.
Builders draft and submit. The independent commissioner reviews and signs. From that moment the record is sealed, and revisions become new versions.
- Role-gated: only the IC can sign or reject
- Signed PDFs carry a cryptographic hash
- Full review history on every deliverable
Review queue
Independent commissionerTest schedule Rev B
Signedsha256 9f2c...e81a
ITR pack, 12 systems
Ready for reviewSigned records are hashed and locked. Revisions become new versions.
Completions
Drops into the completions system you already run.
Export a bundle with the ITR loader sheet, signed PDFs and a manifest, matching the layout completions teams already import. A live sync adapter is built in and activates when your instance is connected.
- Loader sheet in the standard layout
- Signed PDFs included as the record set
- Live sync ready when you are
Completions export
SC-package-JOB.zip
- itr_loader.csv, 38 rows
- signed-pdfs/ 14 documents
- manifest.json
Loader sheet, signed PDFs and manifest in the layout completions teams already use. A live sync adapter is built in for when your instance is ready.
Built to the standards that govern the work.
The allowables, pressures and thresholds come from a verified standards library. When two standards conflict, the most onerous governs, and the schedule shows which.
Twenty minutes, your documents.
The fastest way to evaluate Archie is to watch it read a project you know. Bring a spec and a drawing set to the demo.
