One workspace for the commissioning trail
Archie reads the project's drawings, models, specifications and schedules, then computes every quantity, allowable and test pressure with a deterministic engine.
Book a demoGrouped the way the job is bought
Asset register
MSD/L02/0207
L02-0408 COMMS EQUIPMENT ROOM
Room proved byModel
The element sits inside that room on the model, never by proximity.
Drawings in, register out
Every asset harvested, placed in its room, with a basis.
Ductwork take-off
Element area
1,399.0m²
Every duct element measured once. The connected basis is a separate total and is never added to this one.
Take-off and scope gaps
Quantities measured, then specification, drawings and bill reconciled.
Governing allowable
DW/144
166.28L/s
268.2 m² × 0.620
The lower of the two standards, at 500 Pa, sealing class B.
Documents that survive review
The governing requirement named by tier, every time.
Assets on plan, level 02

LVR/L02/0311 computes into a room other than the one assigned.
Room checks on your sheets
Placements you check by eye, on your own layouts.
Sealed exam
Sample rate
10% by length
p3verified
Read from RIV-ITP-MECH-Rev-2.pdf, a document held back before the work started.
A sealed exam
A fifth of the register is sealed before work starts.
Deliverables
Ductwork Leakage Test Schedule
v3 locked
No edit action is offered, because none would be accepted.
Security, stated honestly
Isolation, encryption, role-gated access and a full audit trail.
Archie is not a tool your team uses. It is a member of your team.
Numbers with their own working
2,459
tagged assets registered on a live project
96%
of those assets placed in a room
89 of 103
held-out rooms correct
0
numbers written by a language model
One engine reads the project. These are the things that come out of it.
Fire and smoke damper register
Asset registerOne row per damper tag, matched to its room, its system and the thing that proved the room. A tag whose room cannot be proved is printed with the room withheld.
Tags on register
13
Room proved
12
From the model
6
Withheld
1
| Tag | Room |
|---|---|
| L02-0408 COMMS EQUIPMENT ROOMModel | |
| L02-0410 LIFT LOBBY CIRCULATIONModel | |
| L02-0412 RISER 2Printed mark | |
| L02-0412 RISER 2Printed mark | |
| L02-0416 MCC CONTROL ROOMDrawn symbol | |
| L02-0414 MAINTENANCE STOREModel | |
| L02-0416 MCC CONTROL ROOMModel | |
| L03-0508 TENANCY OFFICE FLOOR EASTPrinted mark | |
| L03-0512 TENANCY OFFICE FLOOR WESTPrinted mark | |
| L03-0508 TENANCY OFFICE FLOOR EASTModel | |
| L03-0512 TENANCY OFFICE FLOOR WESTModel | |
| L03-0516 PLANT RISER 4Drawn symbol | |
| WithheldWithheld |
Showing all 13 tags. Open a row to see where its room came from.
The register
Every row carries its room, its source and its basis.
Ductwork take-off
Measured quantitiesCriteria version riv-2026-09-a
Systems
7
Run length
629.2m
Element area
1,399.0m²
Spread between bases
80.4m²
Area basis
Every duct element is measured once. A crossover section that two systems both draw through is held against one of them only, so the total is the fabric that exists. This is the basis for a quantity.
Reading now: Element area, 1,399.0 m² across 7 systems. The other basis reads 1,479.4 m². The two are never added together.
SA Supply air
3 systems
| Ref | Len m | Element m² | ||
|---|---|---|---|---|
| SA-01L02-0402 AHU PLANT ROOM | 118.4 | 268.2 | ||
| SA-02L02-0410 LIFT LOBBY CIRCULATION | 74.9 | 171.0 | ||
| SA-03L03-0508 TENANCY OFFICE FLOOR EAST | 141.2 | 322.6 | ||
| SA total | 334.5 | 761.8 |
RA Return air
2 systems
| Ref | Len m | Element m² | ||
|---|---|---|---|---|
| RA-01L02-0414 MAINTENANCE STORE | 96.7 | 214.9 | ||
| RA-02L03-0512 TENANCY OFFICE FLOOR WEST | 88.1 | 196.4 | ||
| RA total | 184.8 | 411.3 |
TA Toilet exhaust
2 systems
| Ref | Len m | Element m² | ||
|---|---|---|---|---|
| TA-31L02-0421 SANITARY CORE NORTH | 52.3 | 108.7 | ||
| TA-32L03-0519 SANITARY CORE SOUTH | 57.6 | 117.2 | ||
| TA total | 109.9 | 225.9 |
Illustrative figures. System refs, room codes and fan families are invented for this page.
Take-off
Quantities computed from the documents by rule, never by a model.
Assets on plan
Level 0214 of 14 drawn · 3 position flags

Hover or focus an asset to read its tag, room and the basis its position came from. Every flag on this plate sits on a basis other than the model.
3 assets computed into a room other than the one assigned.
Plan linework is a de-identified crop with every text span removed. Tags, rooms and positions are invented for this page.
Assets on plan
Every roomed asset drawn on your own layout sheets.
ITR Pack · Ductwork Leakage (ITR-MEC-014)
ITR packSA-01 · L02-0402 AHU PLANT ROOM · Rev B
Pre-test checks
0 of 6 complete
Test pressure
Sealing class
Class B, the specified class for this system. The two standards land close together and the tighter one governs.
Test particulars
Test pressure
500Pa
Design flow
4,200L/s
Design ESP
500Pa
Duct length
118.4m
Duct area
268.2m²
Min test length
11.8m
10 per cent of the run
AS allowable
210L/s
268.2 m² × 0.783
DW allowable
166.28L/s
268.2 m² × 0.620
Governing allowable (DW/144)
166.28L/s
The lower of the two, at 500 Pa, class B
Crossover area
21.5m²
Mandatory test
Yes
Result
Result withheld. 6 pre-test checks outstanding, so this record carries no verdict yet.
Sign-off
Illustrative figures. The pack number, system ref, room code and leakage factors are invented for this page.
Commissioning documents
The governing requirement chosen by tier, and the tier named.
Scope gap reconciliation
Scope gap registerThe specification, the drawing set and the priced bill are read separately, then compared. A system that is not in all three is a gap, and a gap is worth money or a fire engineering consequence.
Systems read
12
In all three
8
Gaps
4
RA-02not found in the priced bill
EA-02not found in the drawings
EA-03not found in the specification
SX-02not found in the priced bill
- Specification
- cl. 15.2.1
- Drawings
- RIV-MECH-DUCT-0001
- Priced bill
- Item 4.01
- Specification
- cl. 15.2.1
- Drawings
- RIV-MECH-DUCT-0002
- Priced bill
- Item 4.02
- Specification
- cl. 15.2.2
- Drawings
- RIV-MECH-DUCT-0006
- Priced bill
- Item 4.03
- Specification
- cl. 15.3.1
- Drawings
- RIV-MECH-DUCT-0003
- Priced bill
- Item 4.04
- Specification
- cl. 15.3.1
- Drawings
- RIV-MECH-DUCT-0007
- Priced bill
- Not found
- Specification
- cl. 15.4.1
- Drawings
- RIV-MECH-DUCT-0004
- Priced bill
- Item 4.06
- Specification
- cl. 15.4.2
- Drawings
- Not found
- Priced bill
- Item 4.07
- Specification
- Not found
- Drawings
- RIV-MECH-DUCT-0008
- Priced bill
- Item 4.08
- Specification
- cl. 16.1
- Drawings
- RIV-MECH-DUCT-0002
- Priced bill
- Item 4.09
- Specification
- cl. 16.1
- Drawings
- RIV-MECH-DUCT-0007
- Priced bill
- Not found
- Specification
- cl. 15.5
- Drawings
- RIV-MECH-DUCT-0003
- Priced bill
- Item 4.11
- Specification
- cl. 15.7
- Drawings
- RIV-MECH-DUCT-0006
- Priced bill
- Item 4.12
Showing all 12 systems. 4 of them are gaps.
Scope gaps
Specification, drawings and priced bill reconciled as three independent sources.
Leakage testing: what each document actually requires
5 documents, 5 columns. Cells are extractions with page citations, unverified until checked.
| Document | Duct classification | Test standard | Sample rate | Witness required | Rectification |
|---|---|---|---|---|---|
| RIV-COMMISSIONING-PLAN-Rev-A.pdf | Not addressedunverified | Not addressedunverified | Not addressedunverified | ||
| RIV-FIRE-DAMPER-SCHEDULE-Rev-A.pdf | Not addressedunverified | Not addressedunverified | |||
| RIV-ITP-MECH-Rev-2.pdf | |||||
| RIV-MECH-SPEC-Rev-C.pdf | |||||
| RIV-SUBCONTRACT-MECH-Rev-B.pdf | Not addressedunverified | Not addressedunverified |
Hover or focus any cell to read the sentence it was extracted from.
RIV-COMMISSIONING-PLAN-Rev-A.pdf
- Duct classification
- Not addressed
- Test standard
- AS 4254.2 referenced for leakage, AS 1668.1 for smoke controlp9verified“Leakage testing shall be carried out to AS 4254.2 and smoke control testing to AS 1668.1.”
- Sample rate
- Not addressed
- Witness required
- Independent commissioning agent to witness all hold pointsp11verified“All hold points shall be witnessed by the independent commissioning agent.”
- Rectification
- Not addressed
RIV-FIRE-DAMPER-SCHEDULE-Rev-A.pdf
- Duct classification
- Not addressed
- Test standard
- AS 1668.1:2015 damper drop testp1verified“Each damper shall be drop tested in accordance with AS 1668.1:2015.”
- Sample rate
- 100% of dampersp1verified“One hundred per cent of installed dampers shall be drop tested.”
- Witness required
- Fire engineer to witness the first 10 dampersp2unverified“The fire engineer shall witness the first ten damper drop tests.”
- Rectification
- Not addressed
RIV-ITP-MECH-Rev-2.pdf
- Duct classification
- Class B, 500 Pap3verified“Ductwork is Class B and shall be tested at 500 Pa.”
- Test standard
- AS 4254.2:2012p3verified“Leakage testing to AS 4254.2:2012.”
- Sample rate
- 10% by lengthp3verified“Ten per cent of each system by length shall be tested.”
- Witness required
- Hold point, Superintendent and Contractor QAp4verified“Hold point. Superintendent and Contractor QA to attend.”
- Rectification
- Raise NCR, re-test, close out before commissioningp4unverified“Raise a non-conformance report, re-test and close out before commissioning.”
RIV-MECH-SPEC-Rev-C.pdf
- Duct classification
- Class B to AS 4254.2, low pressure, 500 Pa maximump41verified“All low pressure ductwork shall be Class B to AS 4254.2 and shall not exceed 500 Pa.”
- Test standard
- AS 4254.2:2012 with DW/144 as the cross-checkp41verified“Leakage shall be assessed to AS 4254.2:2012, with DW/144 used as a cross-check.”
- Sample rate
- 10% of installed length per system, minimum one test per systemp42verified“A minimum of 10 percent of the installed duct length of each system shall be tested.”
- Witness required
- Superintendent's representative, 5 business days noticep43unverified“The Superintendent's representative shall be given five business days notice of each test.”
- Rectification
- Seal, re-test the full system, not the failed section onlyp43unverified“Where a system fails, the full system shall be sealed and re-tested, not the failed section only.”
RIV-SUBCONTRACT-MECH-Rev-B.pdf
- Duct classification
- Adopts the specification by reference; no separate class statedp12verified“The Subcontractor adopts the specification classification by reference.”
- Test standard
- Not addressed
- Sample rate
- Priced at 10%, confirm against spec cl. 15.6.4p27unverified“Leakage testing is priced at ten per cent of installed length.”
- Witness required
- Not addressed
- Rectification
- Re-test at Subcontractor's cost, no extension of timep28verified“Re-testing after a failure is at the Subcontractor's cost and carries no extension of time.”
Drawing to schedule
One symbol on a sheet, one schedule you can defend.
Deliverables
Riverside commercial towerSigning is the only thing that seals a record
- 1Draft
- 2Ready for review
- 3Signed
Schedule table · 1
Ductwork Leakage Test Schedule
v1 · generated for job RIV-MECH · 12 systems
Open. Anyone with write access can change it, and every change stays in this version.
Event trail
- 01v1 drafted from the job record
ITR packs · 1
ITR Pack · Ductwork Leakage (ITR-MEC-014)
v2
Evidence · 1
Evidence Pack · Ductwork Leakage (Level 2)
v1
Illustrative record. Titles, versions, the stored hash and every event line are invented for this page.
Sign-off
Signing renders the PDF, stores its hash and locks the record.
Every document type Archie generates
Registers and schedules:
Mechanical asset register
Assets by room
Assets on plan
Damper register
Valve register
Scope gap register
Materials take-off
Bill of quantities
Tests, plans and close-out:
Ductwork leakage test schedule
Pipe pressure test schedule
Inspection and test plan
Test record forms
Commissioning plan
Method statements
Risk register
Document request list
Documents you cannot afford to leak
Put your security requirements to us and we will answer them, control by control.
Our security posture